EPC Safety Studies

TSG engineers have extensive experience in EPCM environment from all project phases, starting from Concept -> FEED -> Detailed Design -> Construction -> Commissioning -> and Operation.

Our team members develop process safety documentation for various megaprojects in Middle East, Australia, Canada and Europe when working for large EPCM companies.

In terms of specific studies provided for the fertilizer industry we can list the following:

Safety Report Development

  • Hazard Identification
  • Consequence Analysis
  • Formal Safety Assessment
  • Deterministic Risk Study
  • Quantitative Risk Study
  • ALARP Demonstration

Hazard Identification Studies

  • HAZID
  • HAZOP
  • SIMOPS
  • CHAZOP
  • SAFOP
  • SMS
  • Bow-tie
  • Design Review
  • What if Analysis

Consequence Studies

  • Gas Dispersion Modelling
  • Flare and Vent Radiation & Dispersion Modelling

Formal Safety Assessment

  • Fire and Explosion Analysis (FEA)
  • Quantitative Risk Analysis (QRA)
  • Emergency System Survivability Analysis (ESSA)

Deterministic Risk Studies

  • System Reliability Analysis (RAM)
  • Failure Mode, Effects & Criticality Analysis (FMECA)
  • Safety Integrity Level (SIL) Study
  • Layer of Protection Analysis (LOPA)
  • Development and Management of Hazards Registers
  • ALARP Assessment and Demonstration

Quantitative Risk Studies

  • Fault Tree Analysis (FTA)
  • Event Tree Analysis (ETA)
  • Quantitative Risk Analysis (QRA)
  • Risk Based Cost Benefit Analysis (CBA)
  • Sensitivity Analysis

WE WORK WITH